Zip CH103 Instruções de Operação Página 6

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 10
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 5
Zip Chill Tap - Installation & Operating Instructions - 82127 - June 2012 v1.03 Page 6 of 10
Ensure there is adequate ventilation available through the cupboard. If there
is inadequate ventilation, and the cupboard temperature rises to above 40°C,
the chiller may become damaged and malfunction which will void the product
warranty.
There must be a minimum 168 cm
2
of cupboard cross-flow ventilation.
Suitable holes or vents will need to be cut into the cupboard and door.
For safe operation, thoroughly flush the water through after non-use periods
longer than 12 hours.
Filter cartridges should be replaced at least every 6-12 months, or sooner if
you notice:
A. a persistent reduction in water pressure from the product, or;
B. an unpleasant taste or odour in the water.
Not changing the cartridges when required may cause the water to become
biologically unsafe.
Electrical
Electrical connection is to be made by a Zip Service Engineer or a qualified
electrician.
Appliance to be wired to a double pole switched fused spur with a minimum
breaking capacity of 13 amps.
The supply flex must be securely fixed to the clamp provided within the unit.
The connection point is behind the front cover.
Installation must comply with current IEE regulations and any Local Authority
requirements.
This appliance must be earthed.
DO NOT turn the electric supply ‘ON’ until the unit is purged (see
commissioning below).
Installation Instructions continued
Operating Procedures
Commissioning
Operation
Chilled water is obtained by pressing the lever on the carafe filler. The water is
chilled by a refrigeration unit fitted within the cabinet, under the basin.
With the carafe filler, you can obtain chilled water within the rated capacity for
as long as you press down the lever or for longer periods by lifting the lever up
until it clicks and stays open. Flip it back down to stop the water flow.
Commissioning
Clip the tubing in the cupboard. After the appliance is installed and connected,
turn “ON” the water supply. Check all connections for leaks. Repair any found.
The filters, chiller and tubing are full of air until purged. Press the operating
lever on the appliance outlet tap for a minimum of five minutes until all of the
air has been purged from the system.
Wipe clean and dry the area.
Dispose of packaging wisely.
Vista de página 5
1 2 3 4 5 6 7 8 9 10

Comentários a estes Manuais

Sem comentários